• Version Arabic
  • Download 6
  • File Size 1,005.04 KB
  • File Count 1
  • Create Date August 8, 2020
  • Last Updated August 8, 2020

مدى كفاءة NPVالمرتكز على التدفقات النقدية المخصومة في تقييم مشروع "TORON"

Zabat AbdelhamidMorchedi Kamel


Abstract:

The objective of the research is to highlight the efficiency of the NPV based on DCF in the "TORON" project evaluation. The efficiency of the approach is related to the method of determining the incremental cash flows of the project and how the discount rate was chosen, taking into account the effects of inflation, leverage, risk, and The great role played by the marketing and technical feasibility study in determining  cash flows, which resulted in the difficulty of determining efficiency due to the difficulty in controlling the specific variables of the cash flows of the project, whether macro, or micro economics variables.

Keywords: cash flows, Net present value, discount rate, risk.

Jel Classification Codes : G3-31

Abstract:

The objective of the research is to highlight the efficiency of the NPV based on DCF in the "TORON" project evaluation. The efficiency of the approach is related to the method of determining the incremental cash flows of the project and how the discount rate was chosen, taking into account the effects of inflation, leverage, risk, and The great role played by the marketing and technical feasibility study in determining  cash flows, which resulted in the difficulty of determining efficiency due to the difficulty in controlling the specific variables of the cash flows of the project, whether macro, or micro economics variables.

Keywords: cash flows, Net present value, discount rate, risk.

Jel Classification Codes : G3-31

By jesmsc

Leave a Reply

Your email address will not be published. Required fields are marked *